湿粘土

  • 网络wet clay
湿粘土湿粘土
  1. 为了使工作更容易,工人们可以用湿粘土或牛的脂肪来润滑道路。

    To make the work easier , workers may have lubricated the paths either with wet clay or with the fat from cattle .

  2. 论湿粘土路基的压实标准

    On the Compaction Standards for Subgrade of Wet clay

  3. 在总结分析现有过湿粘土路基处理方法的基础上,着重对掺消石灰法进行了研究。

    Technique of over-wet soil used for roadbed construction and degree of compaction testing ;

  4. 湿型粘土砂质量自动检测与控制技术述评

    Review of Green Sand Automatic Measurement and Quality Control Techniques

  5. 快速评价铸造用湿型粘土砂质量的新方法及装置

    New method and device for fast evaluating the quality of green sand

  6. 多机通讯在湿型粘土砂质量测控系统中的应用

    The Application of Multi-computer Communication in Testing & Controlling System of Green sand Quality

  7. 透气性、紧实率及铸型紧实度是湿型粘土砂及砂型的重要性能指标。

    Permeability , compactibility and mould compaction are important performance characteristics of green sand and mould .

  8. 所以很有必要对高紧实度造型用湿型粘土砂的回弹机理进行深入地研究。

    Therefore it is necessary to research the mechanism of greensand used for high compacted molding methods thoroughly .

  9. 本文在型砂组分快速检测方法的基础上,研究了一种湿型粘土砂质量直接控制技术。

    Based on a fast ingredient testing method , a direct control technique of green sand quality is investigated in this dissertation .

  10. 针对上海地区湿软粘土的路基条件和多雨的气候特征,提出采用水泥石灰综合处治路基的技术措施,并对水泥石灰土的路用性能进行了室内试验与现场测试研究。

    In accordance with the road subgrade condition and the climatic characteristics in Shanghai area , cement lime soil stabilization was proposed to strengthen the subgrade soil .

  11. 由于缺乏有效粘土含量的快速检测方法,目前的湿型粘土砂质量控制系统多采用由性能检测到组分控制的间接控制模式。

    Because there is no fast testing method for active clay , most of the green sand quality control systems at present work in direct mode , from performances testing to ingredient controlling .

  12. 这是一种机构简单、投资少、高速、高效、低能耗的湿型粘土砂造型实砂机构,渴望开发这一机种为我国铸造旧线改造做贡献。

    And it is a new molding machine of simple design , high speed , excellent efficiency , lower energy consumption and smaller investment The author thirsts to develop this kind of foundry machine to make contributions to China foundry old production-line reform .

  13. 根据我国铸造生产的实际情况,提出采用加热气流再生粘土旧砂的方法,解决铸件大批量生产湿型铸造粘土旧砂再生问题。

    According to the practical situation of foundry production in China , technique of clay sand reclamation by heating gasis presented to solve the reclaiming problems of used clay sand in green sand casting by large scale production .