爬模

pá mú
  • Climbing formwork;creeping formwork
爬模爬模
爬模[pá mú]
  1. DOKA爬模系统的设计特点及在工程中的应用

    Design Characteristics and Construction Application of DOKA Climbing Formwork System

  2. 深圳规划大厦外墙面和部分内墙柱为清水混凝土,面积达3万m2,施工中采用爬模续浇法解决了一次浇筑过高带来的质量问题;

    The external wall face and some internal walls and columns in Shenzhen Planning Plaza are of fair-faced concrete with an area of 30,000 m2.Continuous concreting method with climbing formwork was employed in the construction to avoid such quality problem as is caused by concreting once too high .

  3. 椭圆斜筒液压爬模施工方案

    Construction program of hydraulic lifting climbing form of elliptical oblique cylinder

  4. 超高层建筑滑模法与爬模法施工技术

    Construction technology of slip-form and climbing shuttering method on super high building

  5. 导轨式电动爬模施工技术在塔类结构工程中的应用

    Electrically operated form of rail-type applied to buildings of tower style structure

  6. 全液压整体爬模技术在超高层建筑施工中的应用

    Technology of hydraulic integral climbing form applied to super high-rise building construction

  7. 超高层建筑爬模系统液压模架测试研究

    Application of testing technology in super high-rise building hydraulic mould flame research

  8. 液压爬模系统的构造及应用

    The application and structure of hydraulic climbing form system

  9. 苏通大桥主1号墩液压爬模施工技术

    Technology of Hydraulic Climbing Formwork for Construction of Main Pier No.1 for Suzhou-Nantong Bridge

  10. 上海长宁区某高层住宅施工中爬模技术的应用

    Application of climbing formwork technology in a high residence in Changning area in Shanghai

  11. 本文针对桥梁高墩施工的关键技术&爬模施工做了初步分析。

    This paper analyses the key technology of bridge high-pier construction & climbing technology .

  12. 自爬模施工在高速公路中的应用

    The Application of Climbing Slipform Construction to Expressway

  13. 导轨式电动整体爬模施工技术

    Construction technology of electric integrally-rising formwork with rail

  14. 钢筋混凝土拱肋劲性骨架爬模施工分析劲性钢筋混凝土结构

    Analysis on steel skeleton and climbing framework for construction of reinforced concrete arch rib

  15. 坑口火电厂高耸钢筋砼烟囱爬模施工技术

    Construction Technology of climbing formwork on kengkou thermo power plant high reinforced concrete chimney

  16. 液压自升爬模的研制与应用

    Research and Application of Hydraulic Self-Climbing Formworks

  17. 谷拉河大桥混凝土薄壁空心墩爬模施工技术

    Construction Technique of Climbing Forms for the Thin-Walled , Hollow Piers of the Gula River Bridge

  18. 液压自爬模在忠县长江大桥11号墩主塔施工中的应用

    Application of Hydraulic Self-Climbing Form to Construction of Pylon atop Pier No.11 of Zhongxian Changjiang River Bridge

  19. 超高层建筑空调设计及节能技术应用超高层建筑滑模法与爬模法施工技术

    Skyscraper air-conditioning design and energy-saving technology application Construction technology of slip-form and climbing shuttering method on super high building

  20. 中天广场主楼爬模、飞模体系的设计和施工

    Design and construction of the climbing form and deck form for con-struction of the Zhong-tain square project main building

  21. 本文通过方案比选确定了采用悬臂爬模施工技术,并详细介绍了变截面空心薄壁墩悬臂爬模施工技术。

    This article introduced the cantilever climbing form construction technology of variable section hollow thin-walled pier through scheme comparison and selection .

  22. 通过郑州西南绕城高速公路中实例说明爬模施工的技术应用,以及按施工主体规模大小、工期长短等综合因素对传统爬模施工工艺的改进。

    Combined with the construction practice , the paper introduced the technical application and traditional construction technology of climbing slipform construction .

  23. 北京中国国际贸易中心二期工程办公楼,采用全液压整体爬模系统,施工中注重整个系统的平稳顶升。

    Hydraulic integral climbing form system was applied to the construction of the project phase II of China International Trade Center , Beijing .

  24. 变截面空心薄壁墩悬臂爬模施工技术单排树形大悬臂墩柱高架轻轨车站结构设计

    The Cantilever Climbing Form Construction Technology of Variable Section Hollow Thin-walled Pier Structural design of light railway station supported by tree-shaped colonnade with long cantilever

  25. 附壁式爬模法在烟囱施工的安装、提升操作、高空拆除过程中的安全技术措施。

    The author describes the safety technological measures of the wall-attachment climbing mould method in the process of installation , lifting and high altitude demolition in chimney construction .

  26. 笔者在本文中重点介绍了液压爬模系统的构造和安装过程,同时也分析了爬升及使用过程中的主要工序和注意事项。

    The structure and erection process of hydraulic climbing form system are not only introduced specially , but also the main working procedure and technical requirements are analyzed .

  27. 方案二采用依附于结构钢骨柱的爬模施工工艺,属专门为该工程量身定做,保证了工期,具有很好的经济和社会效益。

    Program 2 used dependent on the structure of steel columns climb Construction Process antis tailored specifically for the project to ensure that the project has good economic and social benefits .

  28. 针对南索塔的施工特点,详细介绍了该桥施工的全过程,并重点叙述爬模施工工艺。

    According to the characteristics of the construction of the south cable tower , this paper illustrates the whole process of construction with the construction technology of climbing form as its emphasis .

  29. 介绍在中塔柱施工中容易出现的问题,如何确定主动横撑的位置、确保根部混凝土不开裂的方法,爬模工艺流程和操作要点。

    The common problems of the middle tower construction is how to locate the active cross brace , the methods of ensuring the concrete against crack , the technologic and operation skills of the climbing form .

  30. 本文主要介绍了混凝土塔柱的施工顺序、施工方法(支架法、滑模法、爬模法和翻模法)、倾斜塔柱的施工抗倾措施、横梁施工及支撑系统。

    The dissertation introduces construction sequence , construction methods ( supporter construction , slip-form construction , climbing formwork and turn-over formwork construction ), anti-overturning measures of the tilted tower , crossbeams ' construction and its bracing structure .