蒸汽吞吐

  • 网络steam stimulation;huff and puff;steam huff puff;css
蒸汽吞吐蒸汽吞吐
  1. 为了改善该块的开发效果,提出了蒸汽吞吐的开发方式。

    Huff and puff is applied to improve the effect of this block .

  2. 复杂断块油藏蒸汽吞吐开发效果分析

    Analysis of Efficiency of Huff and Puff in Reservoir of Complex Small Fault Flock

  3. 稠油油藏蒸汽吞吐后转注CO2吞吐开采研究

    Study on cyclic carbon dioxide injection after steam soak in heavy oil reservoir

  4. 稠油油藏多轮次蒸汽吞吐后注CO2的可行性

    Feasibility Study of CO_2 Injection for Heavy Oil Reservoir after Cyclic Steam Stimulation

  5. CO2辅助蒸汽吞吐开采超稠油作为一种新的采油技术,现场应用取得了良好的开发效果,有着广阔的应用前景。

    CO2 Assisted Steam Stimulation exploiting super heavy oil is a new oil production technology which has extensive application prospect .

  6. 利用物理模拟技术,对蒸汽吞吐后期的稠油油藏转注CO2吞吐技术以改善其开采效果的机理进行了研究,结果表明,蒸汽吞吐后期油藏转注CO2吞吐开采:①增加了弹性驱能量;

    The cyclic carbon dioxide injection technology to improve heavy oil production after steam soak was studied by physical simulation .

  7. 3~5m特薄层超稠油油藏蒸汽吞吐厚度界限研究

    Thickness Limit of Huff and Puff in Superheavy Oil Reservoir of 3 to 5m Thick

  8. 我国的稠油资源非常丰富,蒸汽吞吐法(CSS)是比较适合我国稠油油藏的一种开采方法。

    China is rich in heavy oil reserves . Cyclic steam stimulation ( CSS ) is a suitable way for heavy oil recovery in China .

  9. 对于前期进行过多轮次蒸汽吞吐的普通稠油,随原油粘度增大,注CO2吞吐的换油率增大,可行性增加;

    Study shows that for common heavy oil after cyclic steam stimulation , the higher the oil viscosity , the greater the utilization factor of CO2injection , and the more feasible by CO2stimulation process ;

  10. AGD开发对油藏监测系统的要求与蒸汽吞吐有所不同。

    Reservoir surveillance system of SAGD development is different from cyclic steam stimulation .

  11. 将注蒸汽吞吐井井筒温度场的计算结果引入井筒应力分析模型中,利用有限元分析软件ANSYS计算了不同约束条件下的井筒应力。

    The calculated result of temperature distribution in the steam injection well was introduced into the stress analysis model for the steam injection well . The well bore stresses under different restrictive conditions were calculated by using software package ANSYS .

  12. 依据蒸汽吞吐稠油油藏注采特征曲线,当汽油比(SOR)大于1~2.5时,曲线在半对数坐标上出现直线段。

    In the injection-production curves of producing heavy oil , a straight line segment appears in semi-log coordinate system when SOR greater than 1 to 2.5 . And there is relation of slop of straight line with the reserve .

  13. 稠油蒸汽吞吐热裂解行为研究

    Study on the thermal cracking of heavy oil during steam soak

  14. 大港油田孔102井蒸汽吞吐热采试验研究

    Studies on Steam Recovery in Kong 102 Well , Dagang Oilfield

  15. 新疆油区蒸汽吞吐加密井开发技术经济指标

    Technical and economic indexes for infill well with steam stimulation in

  16. 边水稠油油藏水驱后蒸汽吞吐方案设计

    Program of steam soak FDR heavy oil reservoir after water flooding

  17. 模拟退火法用于蒸汽吞吐注采参数的设计

    Application of simulated annealing to design steam recycling and production parameters

  18. 水平井蒸汽吞吐热采过程中水平段加热范围计算模型

    Calculating models for heating area of horizontal wellbore in steam stimulation

  19. 蒸汽吞吐井的建模计算与实现

    Modeling , Calculation and Realization in Steam Huff - puff Production Well

  20. 稠油蒸汽吞吐注汽系统优化

    Optimization of cyclic steam injection system in heavy oil production

  21. 综合化的蒸汽吞吐注采参数优化设计

    Development of a comprehensive software for optimizing steam stimulation design

  22. 浅层轻质油油藏蒸汽吞吐引效的探讨

    Discussion on the effect of steam stimulation in shallow light crude reservoirs

  23. 蒸汽吞吐阶段加密井网可行性探讨

    An approach to feasibility of infill well pattern during steam stimulation phase

  24. 注蒸汽吞吐井井筒应力的数值计算方法

    Numerical calculation method for well bore stress in the steam injection wells

  25. 稠油蒸汽吞吐产量预报方法

    Method of forecasting production of heavy oil by cyclic steam injection process

  26. 氮气辅助蒸汽吞吐工艺在面120区的应用研究

    Application of nitrogen & assisted steam stimulation technology in Mian 120 block

  27. 蒸汽吞吐汽窜调剖参数优化设计研究

    Optimization design of profile control parameters for steam stimulation wells

  28. 具防砂功能的蒸汽吞吐稠油井改性硅酸盐蒸汽转向剂

    Modified Silicate Steam Diversion Agent for Use in Sanding Steam Huff-Puff Wells

  29. 出砂冷采技术在低周期蒸汽吞吐井中的应用

    Application of Sand Production Cold Recovery Technology to Low-cycle Steam Soaking Wells

  30. 水平井蒸汽吞吐生产动态研究

    Study on Transient Performance for Horizontal Well with Steam Stimulation