蜀河
-
汉江蜀河水电站工程建设用地地质灾害危险性评估与防治措施
Risk evaluation and preventing treatments of construction district in hydropower project
-
汉江蜀河水电站库水位对岸坡稳定性的影响分析
Influence of Water Level of Shuhe Hydraulic Power Station on Reservoir Bank Stability
-
物探法在汉江蜀河水电站围堰渗漏部位探测中的应用
Application of physical exploration methods in detection of cofferdam leakage location of Shuhe hydropower station on the Hanjiang River
-
论文还求得了汉江蜀河水电投资项目的风险综合评价值。
Moreover , the value of risk comprehensive evaluation of ShuHe project is achieved and levels of risk are classified .
-
为了保证汉江蜀河水电站截流工程成功实施,进行了截流水工模型试验研究。
In order to guarantee the success of work for river closure of Shuhe River hydropower station project in Hanjiang River , the hydraulic model test of river closure was carried out .
-
在保证安康、蜀河水库安全以及安康水库下游防护对象安全的前提下,考虑安康、蜀河区间洪水,以最大削峰为准则,建立安康水库的优化调度模型,采用动态规划法进行求解。
Based on the security of Ankang reservoir , Shuhe reservoir and the protected objects in downstream area of Ankang reservoir , an optimal operation for Ankang reservoir is established , which considered the rule of utmost flood peak reduction and local inflows .