西气东输
- 名West-East Gas Transmission;West-to-East Natural Gas Transportation Project;transporting natural gas from the western regions to East China
-
西气东输X标主要的施工设备选用
Selection of Main Equipment in X-Section of Gas Pipeline Construction
-
PLC在西气东输管线压气站中配置方案的设想
The Assumption of Configuration of PLC in Compression Station on West-to-East Gas Pipeline
-
前言:文章介绍了在西气东输X标段中所选用的若干种施工设备及其简单的性能。
The article introduces some construction equipment and their performance in X-section of " from west to east " project .
-
利用输气管道模拟软件(TGNET)研究了2008年西气东输管道的短期调峰问题。
Based on the West-to-East Gas Pipeline 's operation in2008 , the research on short-term peak shaving is carried out .
-
EST管道风险评价在西气东输工程中的应用
Application of EST Pipeline Hazard Evaluation to Natural Gas Transportation Engineering from WestWard to Eastward
-
西气东输管道工程P3网络计划编制
Authorization of P3 Network Plan in the West-East Natural Gas Transportation Project
-
加强西气东输管道施工的HSE管理之探讨
Discussion of HSE Management of Pipeline Construction
-
西气东输工程成为CDM项目的潜力分析
Potential Analysis of Project of Natural Gas Transmission from West to East China Being CDM Program
-
CRCEVANS全自动焊技术在西气东输二线管道工程中的应用
Application of CRC EVANS Fully Automatic Welding Technology in Second West to East Gas Transmission Pipeline Project
-
为了迎接西气东输和配合液化天然气(LNG)的输入,我国东部地区正在建设一批大型联合循环电厂。
A number of large-scale combined cycle power plants are being built in East China in line for the West-to-East Gas Transmission Project and input of LNG .
-
RMD焊接技术在西气东输二线工程中的应用
Application of RMD Welding Technology in the Second West-to-East Natural Gas Transmission Pipeline Project
-
西气东输工程招商、广东LNG和福建LNG项目商务合同取得重要进展;
Encouraging progress was made also in promoting the West-East Gas Pipeline project , as well as progress with commercial contracts for the Guangdong LNG project and Fujian LNG project .
-
西气东输二线9A标段焊接质量控制
Welding quality control of the section 9A of the West-East Gas Transmission Pipeline No.2
-
西气东输干线RR压缩机组消防系统探头误报警,会导致机组故障停机,且造成CO2喷射的浪费。
The false alarms from the probes in fire fighting system of RR compressor unit in West-East Natural Gas Pipeline may cause the compressor shutdown in malfunction and waste CO2 spraying .
-
STT半自动根焊+APW-Ⅱ自动焊工艺在西气东输管道焊接中的应用
Application of STT Semiautomatic Root Welding Plus APW - ⅱ Automatic Welding Process in West - east Pipeline Project
-
西气东输管道工程是国家实施西部大开发战略的标志性工程之一,加强该工程的HSE管理,与国际施工管理接轨,势在必行。
Pipeline engineering of West China gas transported to the east is one of the sign project that our country implements west big development strategy project . Reinforcing the HSE management with world management to conform is imperative .
-
西气东输管道工程在河南境内三次穿越拟建中的南水北调中线工程,穿越长度均约200m。
There are thrice pipeline crossings through the midline of South to North Water Diversion Project within Henan province for West to East Gas Pipeline Project . The length of each crossing is about 200m .
-
用TGNET建立了西气东输管道短期调峰模型,并对高峰周储气库采气方案进行了大量模拟。
TGNET models of the West-to-East Gas Pipeline for short-term peak shaving are established .
-
最后结合实例,介绍了STM系列大容量高速感应电动机在西气东输石油管线上的案例以及批量生产后该系列振动试验值情况。
At last , an example has been given to illustrate an application of STM series for large-capacity high-speed induction motors in the West-East oil pipeline . The vibration test data of mass produced motos are alos discussed .
-
在西气东输管道工程第17标段的管道焊接中,成功地采用了STY半自动根焊+APW-Ⅱ自动焊工艺。
The STT semiautomatic root welding plus APW - II automatic welding process has been successfully used at 17th hid section pipeline welding in West - east Pipeline project .
-
随着国产X70管线钢在西气东输工程中的应用,国产高强度管线钢硫化物应力腐蚀开裂(SSCC)性能研究显得尤为重要。
Using the NACE standard bent-beam test , sulfide stress corrosion cracking ( SSCC ) of different types microstructure in X70 grade pipeline steel with different types of microstructure was investigated .
-
随着西气东输、俄气南供、进口LNG,近海气登陆等工程的实施,城市使用天然气将会越来越普遍。
With the development of the gas transport projects , such as transport gas from west to east , transport gas from south of Russia to China , import LNG , gas transport to land from sea , the using of gas in city will be more prevalent .
-
在已开工建设的西气东输三线天然气管道中,将采用管径为φ1422mm的管线钢管。
The pipe diameter φ 1422mm natural gas pipeline has been used in the West-East Gas Pipeline construction of three-wire .
-
西气东输管线距离南水北调工程穿黄河隧道的最近距离:河漫滩仅150m,主河槽仅205m。
The distances between the pipeline of West to East Natural Gas Diversion Project and the tunnel of South to North Water Diversion Project are only 150 m apart from river shoal and 205 m apart from main channel .
-
以Elster流量计算机为例,介绍了涡轮流量计与流量计算机为主构成的天然气计量系统在西气东输工程中的应用以及使用情况。
With Elster flow computer as example , the natural gas metering system composed of turbine flow meter and flow computer and its application in West-East Gas Line project are introduced .
-
文章介绍了西气东输管道工程第18标段和第9A标段测量放线的工序:移交设计桩点、施工准备、测量定桩;
This paper introduces the working procedure of survey setting-out at 18th and 9A bidding sections of West to East Gas Transmission Pipeline including handing over design stake points , preparing construction and surveying stakes .
-
通过西气东输管道工程中的焊接实践,介绍了最大直径φ813mm的X60管线钢全位置向下焊的焊接工艺。
This paper introduced a whole - position adown welding technology about the feeding tube applied in the engineer of " Feeding the Natural Gas From West To the East " . Firstly , this paper introduce that when the 813 mm dia .
-
针对典型危险作业,应用作业安全分析法(JSA)充分辨识作业过程中的风险并制定控制措施,提高西气东输工程项目安全运行能力和安全管理水平。
Risk for a typical operation , application of operational safety analysis ( JSA ) to fully recognize the risks involved in operations and to develop control measures to improve the West-East Gas Project safety management and safe operation level .
-
西部原油成品油管道约有900km与已投入运行的西气东输管道并行,其间距大部分在30 ̄50m,并行段内的部分区域需进行石方管沟爆破施工。
There is about 900 km long pipeline of the West Crude Oil and Products Pipeline running in parallel with the operating West to East Gas Pipeline , with the gaps of 30 ~ 50 m between the two pipelines . The pipeline trenching in partial sections needs stonework blasting .
-
西气东输工程线路经过我国西北约2500km的严重缺水地区,管道水试压方法成为工程建设中的一个难题。
For West-to-East Gas Transmission Project , there is a total length of 2500 km of pipeline will pass through the northwestern China , which is badly short of water , ted to a big problem to perform hydrostatic pressure test along this pipeline section .