透平发电机

  • 网络turbine generator;turbo-generator;Turbogenerator
透平发电机透平发电机
  1. 对透平发电机在线监测装置的分析

    Analysis on Devices of On-line Monitoring for Turbine Generator

  2. 透平发电机能否正常工作直接关系到平台能否正常生产。

    Normal operation of the turbine generator has direct effect on normal production of the platform .

  3. 当情况异常时,该紧急切断阀能在0.5s左右切断大管道煤气,保证高炉安全生产和透平发电机安全。

    In case of abnormality , it can block the gas of big pipeline in about 0.5 seconds to insure the safety of the production of blast furnace and Turbine .

  4. 全氢冷透平发电机

    Turbine Generator With Hydrogen Cooling for Stator Winding and Rotor Winding

  5. 石油平台小型透平发电机并网仿真平台研究

    Research on Simulation System of the Offshore Platform Miniaturized Turbine Generators Paralleling

  6. 船舶废气透平发电机复合发电系统供电可靠性设计

    The Design in Reliability of Marine Compounding power station

  7. 联合循环电站透平发电机节能减排新措施

    A new Saving Energy and Reducing Emissions Measures of Turbo-generators for Combined Cycle Power Plants

  8. 简要介绍了废气透平发电机仿真系统的功能和研制的指导思想。

    This paper describes the function of exhaust gas turbo generator simulation system and its main design idea .

  9. 透平发电机入口主蒸汽管增设温度检测及报警装置

    The additional installment of the temperature detector and alarming equipment at the inlet main steam pipes of turbo generator

  10. 近年来,随着燃气-蒸汽联合循环的发展和燃气轮机单机容量的增大,全氢冷透平发电机再次引起人们的重视。

    In recent years , totally hydrogen cooled turbine generators ( THCTG ) have drawn attentions to us again , in company with improvements of CC generation technology and increasing unit capacity of gas turbine .

  11. 基于废气透平发电机的特点,讨论了废气透平发电机仿真系统的基本构成和实现原理,并阐述了软件总体和各子系统的设计。

    In consideration of various characteristics of the exhaust gas turbo generator , the paper discuses the basic construction and principles of the exhaust gas turbo generator simulation system . In this regard , detail information about the design of the software and it 's sub systems is presented .

  12. 论述了规范使用透平型发电机的意义。

    The meanings of standard using turbine generator were discussed .

  13. 透平型发电机标准体系中的几个问题

    Several Problems of Turbine-type Generator Standard System

  14. 术语透平型发电机的时代意义

    Time Meaning of Terminology Turbine Generator

  15. 介绍透平型发电机标准体系中的3个主要问题:术语透平型发电机标准化的时代意义;励磁系统向国际惯例靠拢的问题;

    This paper describes three main problems of turbine-type generator standard system i.e. the time significance of standardized term " turbine-type generator ", the problem of standardization for excitation system and the problem of testing shorted-turns of .

  16. 在高温气冷堆氦气透平和发电机之间布置减速箱,作用是将氦气透平的高转速降低到发电机转子所需要的额定转速。

    In a High Temperature Gas-cooled Reactor ( HTGR ) system , the gearbox is installed between Helium turbine and dynamotor , to reduce the high speed of gas turbine to a normal speed required by dynamotor rotor .

  17. 太阳热透平式风力发电机&风能、太阳能联合发电设想方案

    Solar energy wind turbine generator

  18. 来自透平、电站或发电机的高温尾气;

    Higher temperature exhaust gas from turbine , incinerator and power engine ;