邹县发电厂

  • 网络Zouxian Power Plant
邹县发电厂邹县发电厂
  1. 对邹县发电厂四期工程和系统状况进行了介绍,确定了主蒸汽系统和主给水系统管道的设计参数,选择了管道材料。

    Project and system situation in Zouxian Power Plant were introduced , and the piping design parameters and the piping material of main steam system and main feed water system were determined .

  2. 邹县发电厂三期污水站的调试与评价

    The Commissioning and Appreciation of Sewage Treatment Station in Third Phase of Zouxian Power Plant