锚杆拉力
- 网络bolt pulling force
-
基于MDT的锚杆拉力计三维实体设计
3D solid design of anchor shank tension meter based on MDT
-
本文基于MDT的基础上,针对矿用锚杆拉力计介绍三维参数化设计方法及指出应当注意的问题。
Based on MDT and in view of the mine pull test instrument for bolt , the paper introduces a 3D parameter design method and points out some problems to be noticed .
-
矿用锚杆拉力计的三维参数化设计方法
3D Parameter Design Method of Mine Pull Test Instrument for Bolt
-
智能型锚杆拉力测试系统的研制
The Development of Intelligent Pull Test System for Anchor Bolt
-
介绍一种智能型锚杆拉力测试系统。
A new intelligent pull test system for anchor bolt is introduced .
-
研制了一种性价比高的锚杆拉力测试系统。
A new intelligent pull testing system for anchor bolt has been developed .
-
锚杆拉力测试系统的设计
Development of Pull Testing System for Anchor Bolt
-
借助文末锚杆拉力系数表,计算十分简便。
The calculation is very simple by means of the coefficient tables in the end of this paper .
-
随着填土高度的增加,挡墙侧向土压力、基底土压力及锚杆拉力均在逐渐增加。
Along with the increase of the height of the filled soil , retaining walls ' lateral earth pressure , basal earth pressure and anchor tension are all increase gradually .
-
提出了基于Pro/E的锚杆拉力计三维参数化设计方法,对造型设计中的技术要点进行了探讨,指出了应当注意的问题。
A Pro / E-based 3D parametric modeling and design method for anchor shank tension meter is proposed . Some problems that must be paid attention to be pointed out , and some key techniques are discussed .
-
首先,本文对锚杆端部受拉力时做了理论研究,推导出锚杆剪应力与轴力的分布规律,并定义了锚杆三种不同的受力状态。
Firstly , this paper does theoretical research when tension acts on the bolt tip , and derives the distribution law of the bolt shear stress and axial force , and defines three different bolt stress state .
-
粘性土中锚杆板桩墙锚杆抗拉力的可靠度分析
Reliability analysis of the anchor rod tension resistance of the anchored sheet - piling in cohesive soil
-
通过分析水平位移的各个影响因素对位移的作用,指出锚杆位置下移会增加锚杆的拉力并进而加大其配筋,但可以减小桩顶在锚杆张拉锚固后的水平位移变形。
By analyzing the influence on the displacement among every factors , the approach proposes that the downward anchor can increase its tension and reinforcement , but it also can reduce the horizontal displacement of the top end of the pile after the ancher is pre_tensioned .
-
一般认为锚杆(索)抗滑桩在锚杆(索)拉力、滑坡推力、桩前滑体抗力的作用下绕锚固点(锚拉力作用点)保持力矩平衡,锚固点为一铰支点。
It is a balance system that the anti-slide pile is exerted by three kinds of force , they are the tensile force of anchor , the thrust of sliding mass , the resistance of soil and rock .
-
煤矿井下可回收锚杆一般用于煤层巷道,由于锚杆钻孔的变形和塌孔等原因,用普通套筒扳手拆卸锚杆时,因不能给锚杆提供轴向拉力,很难将锚杆拆卸拔出。
It is difficult to pull out the bolt with ordinary socket wrench that can not provide axial tension because of the bolt drilling hole deformation and the collapse of holes .