丹江口大坝

  • 网络danjiangkou dam
丹江口大坝丹江口大坝
  1. 对ANSYS中的温度场及徐变应力计算进行了一定的研究,通过方法的改进,将其运用于丹江口大坝加高的研究。

    And the calculation of temperature field and creep stress in ANSYS was studied , then the methods were improved on and were used in the study on heightening of Danjiangkou dam .

  2. 丹江口大坝坝基渗流水质分析与评价

    Analysis and appraisement on seepage water quality in Danjiangkou dam foundation

  3. 南水北调中线工程实施丹江口大坝加高后,正常蓄水位由目前的157m提高到170m,对机组运行产生一定影响。

    After the dam has been heightened in the middle route project of the south-to-north water transfer , the storage level will rise from 157m to 170m , which would affect the unit operation .

  4. 水溶性聚氨酯在丹江口大坝裂缝防渗修补中的应用

    Application of water-soluble polyurethane to crack anti-seepage repair in Danjiangkou Dam

  5. 丹江口大坝安全监控综合网络系统的设计

    Design of dam safety monitoring synthetic network system for Danjiangkou Dam

  6. 水电站扩机必要性研究&丹江口大坝加高后的新问题

    Study on the Problem of Increasing Capacity in Danjiangkou Hydropower Station

  7. 南水北调中线及丹江口大坝加高工程施工难点

    South-to-North Water Transfer Project Construction Difficulties in Danjiangkou Dam Heightening Works

  8. 丹江口大坝加高工程的特点与技术难点

    Features and Technical Difficulties of the Danjiangkou Dam Heightening Project

  9. 丹江口大坝加高对机组运行的影响及改造方案研究

    Influence of heightening Danjiangkou Dam on unit operation and unit renovating scheme

  10. 丹江口大坝右岸第6号坝段顶部下游边角老混凝土爆破拆除

    Explosive Demolition of Previously Hydrated Concrete at a Corner of Danjiangkou Dam

  11. 浅析丹江口大坝加高水库淹没实物指标调查的成功经验

    Investigation for the Inundated Object Index After the Dam-Heightening of Danjiangkou Reservoir

  12. 丹江口大坝坝基水质特征及帷幕性状评价

    Evaluation of Seepage Field of Grouting Curtain in Danjiangkou Dam

  13. 丹江口大坝加高后发电效益的探讨

    Discussion on benefit of power generation of Danjiangkou Dam after being heightened

  14. 丹江口大坝后期加高工程现场原位抗剪试验研究

    Study on Field Shear Test of Late Heightening Project of Danjiangkou Dam

  15. 丹江口大坝结合面性状对安全度影响研究

    Study of Influence of Concrete Interface Property on Dam Safety

  16. 丹江口大坝加高工程中原坝体裂缝处理工艺

    Treatment for Cracks in Existing Dam Body during Heightening of Danjiangkou Dam

  17. 丹江口大坝右岸转弯坝段反向变形的分析及对策

    Analysis of " reverse " deformation of curved dam section of Danjiangkou dam

  18. 丹江口大坝防渗效果的评价

    Evaluation of seepage - preventing effect for Danjiangkou Dam

  19. 丹江口大坝加高工程关键技术研究综述

    Research Summary of the Key Technologies in the Heightening Project of Danjiangkou Dam

  20. 丹江口大坝坝基扬压力统计模型分析

    Analysis for Danjiangkou dam foundation uplift pressure statistical model

  21. 丹江口大坝加高左岸工程混凝土施工技术综述

    Concrete Construction Technology at the Left Bank of the Danjiangkou Dam Heightening Project

  22. 丹江口大坝基础帷幕中丙凝胶体耐久性研究

    Study on Durability of Acrylamide Gel in Dam Foundation Curtain of Danjiangkou Dam

  23. 丹江口大坝廊道自动抽水控制系统设计与实现

    Design and Realization of automatic pumping control system for the corridor of Danjiangkou Dam

  24. 丹江口大坝加高工程水力学试验研究

    Hydraulics study on heightened scheme of Danjiangkou Project

  25. 丹江口大坝爆破开挖试验及震动监测成果分析

    Studies on Excavation Test of Rock Blasting and Vibration Monitoring in the Danjiangkou Dam

  26. 丹江口大坝加高工程安全监测问题的探讨

    Discussion about Safety Monitoring on Danjiangkou Dam Heightening

  27. 丹江口大坝安全监测系统数据统计模型分析

    Analysis on Data Statistical Model of the Safety Observation System of the Danjiangkou Dam

  28. 丹江口大坝加高工程对渠首县淅川的影响研究

    The Research of Danjiangkou Dam Heightening Project on the Impact of Headwork County & Xichuan

  29. 丹江口大坝加高工程施工与枢纽运行安全管理

    Safety Management of the Construction and the Hydro Project Operation in the Danjiangkou Dam Heightening

  30. 对丹江口大坝加高工程供电系统设计及运行的分析

    Analysis of Design and Operation of Power Supply System for the Danjiangkou Dam Heightening Project