工期索赔
- 网络Claim for extension of time
-
熟练曲线法在工期索赔计算中的应用
Application of learning curve method in calculating the claim for extension of time
-
工期索赔的目的首先是延长工期,避免遭受工期延误罚款;其次是给经济索赔的合法性奠定合同基础。
The object of claim for extension of time is to extend the construction time , to avoid the penalty for delay , and then provide the contract foundation for legality of financial claim .
-
FIDIC《施工合同条件》中费用和工期索赔的计算
A superficial analysis upon claim damages and duration calculation within FIDIC conditions of contract for construction
-
建设工程在FIDIC施工合同条件下的工期索赔管理是工程项目管理工作的一个重要环节。
Management of working-day claims for construction projects in FIDIC construction contracts is an important part of project management .
-
国际施工合同中工期索赔相关概念的辨析
Discrimination in relative concepts of period claim in international construction contract
-
桩基工程地下障碍物费用和工期索赔的处理
Treatment of underground obstacle cost and time-limit claims in pile foundation engineering
-
多因素影响下工期索赔的复杂性
Complication Study on Compensate Time Limit for Project under Double Factors Affection
-
网络分析法在计算工期索赔中的应用
The application of network analysis method in calculating of construction period claiming
-
多事件交叉干扰下的工期索赔方法
Calculation method for claims of multi - event interference delays
-
工程合同索赔包含工期索赔和经济索赔。
Engineering contract claim includes claim for extension of time and financial claims .
-
三因素作用下的工期索赔
Study of the time claim affected by three factors
-
关于工期索赔报告的撰写
The Report Writing about the Claim of Time
-
多因素影响下的工期索赔计算原则研究
Study on the Principle of Calculation of Delay Claims for Project under Multi-Factor Affection
-
公路工程施工过程中的工期索赔
Construction Period Claim of Highway Engineering Construction Procedure
-
工期索赔值计算的动态分析法
Dynamic analysis method calculating construction delay time claimed
-
工期索赔中的叠加效应和发散效应分析
To Analyse on Piling Up Effect and Weakening Effect in Claiming for Extension of Time
-
工期索赔中的工序延迟分析
Activity Delay Analysis in Construction Time Claim
-
工程施工进度控制与工期索赔
Claim for construction time
-
最后在处理索赔问题时要坚持采用科学的方法来计算工期索赔以及费用索赔。
Finally , they should insist in using scientific methods to calculate claims of the work period and expenses .
-
自适应抗混叠滤波器在数据采集中的应用工期索赔中的叠加效应和发散效应分析
Design of Anti-aliasing Filter for Data Acquisition To Analyse on Piling Up Effect and Weakening Effect in Claiming for Extension of Time
-
在深入地分析了工程项目风险分摊与工程索赔的相互关系的基础上,从合同风险分析出发,对业主的工期索赔和费用索赔管理进行了研究。
The management of time claims and cost claims owners run is illustrated in the last part of the article from risk analyzing .
-
工期索赔中考虑了工序的开工延迟以及工序的总时差,从而使索赔结论更具有说服力。
Because start time delay of activity and activity float time were all take into account in time claim , the conclusion was more convictive then before .
-
通过工程实例,详细论述了一般工程的工期索赔原因及其计算方法。
In this paper , the reasons for the claim in common project and calculation method are discussed in detail through project example and it has very strong practice meaning .
-
结合实例,详细论述了网络分析法在施工中计算工期索赔是一种科学合理的分析方法。
According to the practice example , this paper discusses that network analytical method is a scientific and feasible one to calculate construction period claiming in the course of construction .
-
FIDIC施工合同条件下不完全顺延工期赶工索赔的处理
Claim for hurry work of incomplete construction period delay under FIDIC contract conditions
-
多事件干扰下工期延误索赔原则研究
Study on the principle of delay claims with multi - event interference
-
施工企业总承包项目工期管理与索赔的探索
Exploration on Period Management and Claim of Construction General Contract Project
-
本文立足于承包商的角度,对施工延误情况下工期和费用索赔进行了研究。
This paper investigates time and fee claimed at the condition of construction delay from contractor angle .
-
阐述了工期延误的类型,工程延误的处理原则,工期索赔的分析方法,费用索赔处理的基本原则和计算方法。
This paper also gives systematical analysis to the types of project delay and the handling principles of claims of delay and cost .
-
在公路工程施工过程中,由于工程本身和环境有许多不确定性因素,直接造成工程的工期拖延和成本提高,在执行由业主和承包商分担不确定性风险的合同过程中就难免存在着工期索赔。
During the construction procedure of highway engineering , many non definite factors of engineering and its environment delay the construction period , improve the cost .