蓄水坝

xù shuǐ bà
  • storage dam
蓄水坝蓄水坝
  1. 三峡水库于2003年6月蓄水,坝前水位保持在135m。

    The Three Gorges Reservoir started water storage in June 2003 , and water level of the dam fluctuated around 135 meters .

  2. 蓄水两坝间长系列水动力及泥沙淤积的研究

    Long-Term Hydraulic-Dynamics and Sediment Accumulation Between Two Impounding Dams

  3. 三峡水库蓄水后坝上下游航道条件变化分析

    Variation of Channel Condition Above and Below the Dam After Impoundment of the Three-Gorges Reservoir

  4. 根据二维水流连续、运动方程、悬沙扩散方程和两相流底沙运动方程,采用加权集中质量剖分方法,建立了蓄水两坝间水动力、泥沙淤积数学模型。

    According to two-dimension flow continuity , momentum equations , suspended sand diffusion equations and two-phase flow bed sand motion equations , hydraulic-dynamics sediment accumulation mathematical model between two impounding dams was set up by adopting the methods of weighting and concentrating masses .

  5. 水库首次蓄水对上游坝壳的沉降有较大的影响。

    When the reservoir is first impounded there is obvious influence on settlements at upstream crust of dam .

  6. 引黄平原水库蓄水初期围坝干砌石护坡破坏调查与原因分析

    Analysis of the surrounding dam dry laid stone slope revetment damage of a Yellow River Diversion reservoir at early period of water storing

  7. 龙滩水库在下闸蓄水开始阶段,坝下断流,对下游供水有一定的影响。

    In the initial impoundment of Longtan Reservoir , it has certain influences to the downstream water supply since there is no runoff below the dam .