顶推

  • 网络ILM;push
顶推顶推
  1. 我国挠性顶推技术的发展

    The development of flexible pushing technology

  2. 一般拖轮由顶推作业改为艉拖作业或反之,不仅费时费工,而且操作不便。

    The common practice to change from the pushing operation to towing , or vice versa , is both time - consuming and power - wasting , and it is hard to operate as well .

  3. 顶推施工中导梁的合理配置PC梁顶推施工技术的回顾与展望

    Review and Prospect for Incremental Launching Technique for Prestressed Concrete Girder

  4. PC梁桥顶推施工过程分析软件的开发

    Development of Analysis Software for Construction Process with Incremental Launching Method for PC Continuous Bridge

  5. 为了合理计算内河分节顶推船队运输方式的经济效果,本文阐述了综合经济指标E的概念。

    In order to calculate reasonably the economies of transport method of the river push-train , the paper describes the concept of the comprehensive economic index " E " .

  6. 珠江大桥5×50m连续箱梁多点顶推施工

    On Multipoints Jacking Construction of Zhujiang Bridge with 5 × 50 m Continuous Box Girder

  7. 根据地形地貌的情况,西引桥8×42m预应力连续箱梁采用多点顶推法施工。

    The incremental launching method ( SSY ) is employed by the continuous prestressed box girder of the west bank approach bridge , with spans of 8 × 42m in light of the ground circumstance .

  8. 顶推梁桥施工中可能出现的技术问题及对策

    The possible technical problems and Countermeasures during construction of launched bridges

  9. 同时也总结了钢箱梁顶推施工还存在的问题。

    Also summarizes the problems of steel box girder pushing construction .

  10. 斜交箱梁桥顶推法架设施工技术

    Erection Technique for Skew Box Girder Bridge by Incremental Launching Method

  11. 桥梁顶推施工导梁的优化分析

    Optimum analysis of launching nose during incremental launching construction of bridge

  12. 对合拢顶推的施加原理和方法进行论述。

    This paper elaborates the principle and methods of closure pushing .

  13. 大跨径顶推桥梁的新发展

    The Latest Development in Incremental Launching Technique for Longer Span Bridge

  14. 成本结构对长江分节顶推船队经济性的影响

    Influence of Cost Structure on Economy of Changjiang River Push - train

  15. 独柱墩顶推连梁系杆拱桥

    The Continuous Tied-Arch Bridge with Single Pillar and Pier by Launching Construction

  16. 多点柔性墩连续顶推技术在梁桥中的应用

    Application of Flexible Piers Incremental Launching Technology on Beam Bridge

  17. 推船顶推架应力经验公式的相似理论推导

    Deduction of Stress Experimental Formulas of Pushing Frames for Pushboats

  18. 曲线钢箱梁顶推施工计算分析

    Calculation and Analysis of Curved Steel Box Girder By Incremental Launching Method

  19. 顶推施工的宽箱梁预应力体系设计

    Wide Box Beam Prestress System Design of Incremental Launching Construction

  20. 分节顶推船队波浪系结力的预报方法

    A Method for Predicting Connection Forces of Push-Train in Waves

  21. 新型顶推支座在顶推法施工的使用

    The application of new-type pushing bearing in incremental launching construction

  22. 某大桥顶推法施工应力监测

    The Stress Monitor Incremental Launching Method Construction of A Bridge

  23. 针对此情况采用了顶推滑移技术使其复位。

    Pointing to this condition the technology of thrusting slip is introduced .

  24. 连续梁桥顶推工艺的新构思

    A new idea about incremental launching technology of continuous bridge

  25. 逐段顶推架桥技术在我国的应用和发展

    Application and Development of Segmentally Launching Method in Bridges Construction in China

  26. 浅埋大跨径箱涵暗挖顶推施工技术

    Shallow Buried Large Span Box Culvert Hidden Exploitation Incremental Launching Construction Technology

  27. 发展海洋顶推运输的新思维&微型无人推船推驳船队

    New considerations on the development of deep sea push-barge shipping-minitype unmanned pusher-barge unit

  28. 顶推法施工斜拉桥

    Construction with Incremental Launching Method for Cable stayed Bridge

  29. 利用自航船模试验预报分节顶推船队操纵性的研究

    Study on Prediction of Maneuverability of Integrated Barge Push-Train by Self-Propelled Model Test

  30. 广西南宁市五象大道立交刚架桥顶推工艺

    The Pushing Technique of the Overpass of Wuxiang Avenue , Nanning , Guangxi