利用小时数

  • 网络number of utilization hours
利用小时数利用小时数
  1. 发电设备利用小时数变化的影响因素及变化趋势分析

    Influence Factors and Development Tendency of Generating Equipment Availability Hours

  2. 合理选择小水电年利用小时数的探讨

    Choosing the Annual Utilization Hours of Small Hydroelectric Station Rationally

  3. 分别采用时间序列法和最大利用小时数法对电力负荷进行了预测。

    Electric load is also predicted by time sequence method and most using hours method .

  4. 装机容量年利用小时数

    Annual utilization hours of installed capacity

  5. 吉林省东南部山区地方水电年利用小时数对气候变化的响应

    The impact of annual using hours of local hydropower in Northeast mountain area of Jilin Province on the climate change

  6. 汽轮机通流部分改造的经济性与机组的年可利用小时数和标准煤价有很大的关联。

    The economics of retrofitting of flow passage of stream turbine is closely associated with the available hours in whole year and the cost of coal .

  7. 我国当前实行的发电调度方式是平均分配各类机组的发电利用小时数,这种平均分配发电利用小时数的发电计划安排方式造成了巨大的能源浪费及污染物排放。

    The current generation dispatch mode in China is average distribution of electricity utilization of hours , which causes a tremendous energy waste and pollution emission .

  8. 详细分析了2010年各种水文条件下抽水蓄能电站的工作位置和工作容量,以及周调节抽水蓄能电站的发电利用小时数、所需的库容量等;

    The studies of the working position , working capacity , utilization hours of generation and needed reservoir capacity of pumped-storage plant are carry out in detail .

  9. 因此,本文将年度总电能空间分成基础电能和非基础电能两种成分,并对前者实施基本按等平均发电利用小时数分配电能的方式。

    Therefore , this paper divides total annual electric energy into base energy and non-base energy , and base energy distribution method is based on average generation hours .

  10. 以指定时间段内参与计算电站的装机利用小时数相等为目标建立中期火电开机优化模型。

    An optimization model is established for medium-term thermal power boot , which takes the equal hours of capacity utilization as the objective for all thermal power plants in a certain period .

  11. 用电需求大幅下降,部分机组停机、利用小时数下降、用电增速放缓、售电量下滑。

    The demand of electricity has dropped largely , the partial unit engine is off , the using hour falls , the speed-up of using electricity has slowed down , the quantity of electricity sold has also dropped .

  12. 电力工程设计中的技术经济比较涉及到年电能损耗计算,其常用方法就是根据最大负荷利用小时数和功率因数从手册中查取最大负荷损耗小时数。

    The common method about the calculation of electrical energy loss in the technical and economical comparison is looking up the maximum load 's loss hours according to the maximum load 's utilization hours and POwer factor in manual .

  13. 模型的分析结果表明,只要电锅炉的实际年平均利用小时数大于理论最小年平均利用小时数,实施该方案即具有国民经济可行性。

    The model analysis results show that it is national economic feasible to implement the method as long as the actual average annual utilization hours of the installed electric boilers can reach the theoretical minimum of average annual utilization hours .

  14. 通过对它们的成本进行统计、计算和分析,总结出机组容量、脱硫工程的建设时期、燃料特性、脱硫装置年利用小时数、脱硫工艺等是影响机组单位供电量脱硫成本的主要因素。

    Through cost statistic , calculation and analysis , this paper summarizes the major factors that affect desulfurization cost of unit power supply from each unit are unit capacity , project construction term , fuel characteristics , annual availability , and desulfurization techniques .

  15. 通过对韦布尔分布的分析,计算了各个高度上风电场的平均风功率密度、有效平均风功率密度和可利用小时数等风能资源特性参数,为当地的风能开发提供分析基础。

    According to the analysis on local Weibull distribution , average wind power density and effective average wind power density as well as utilization hours of wind farm at each height were obtained . The results are provided for wind energy development in Xinjiang region .

  16. 浅谈新时期高等学校淘汰仪器设备的开发利用装机容量年利用小时数

    Development and Utilization of Obsolescent Equipments in Contemporary Colleges annual utilization hours of installed capacity

  17. 通过电力需求侧管理在丘陵农业县的探索应用,说明实施电力需求侧管理在经济欠发达地区也能起到促进合理利用电力、提高负荷率、增加发电设备利用小时数、拓展电力市场的作用。

    The application of demand side management in agricultural hilly land proves its effectiveness in poor economic developing area . It helps to promote reasonable power usage , in - crease load period efficiency , increase the generation facilities usable hours and further open the power market .