工作分解结构

  • 网络work breakdown structure;WBs;WBS work breakdown structure
工作分解结构工作分解结构
  1. 工作分解结构确定了项目整个范围,并将其有条理地组织在一起。

    The WBS organizes and defines the total scope of the project .

  2. 工作分解结构是当前批准的项目范围说明书规定的工作。

    The WBS represents the work specified in the current approved project scope statement .

  3. 层次型Agent在工程量工作分解结构中的构建及应用

    Construction and Application of Sandwich Agent in Work Quantity WBS

  4. 我们汇集的角色与职责可以用于您的工作分解结构(workbreakdownstructure)。

    Our collection of roles and responsibilities can serve as input to your work breakdown structure .

  5. 对于能力模式和交付过程的创建中的第三步,会生成一个工作分解结构(workbreakdownstructure,WBS)。

    For the third step in the creation of the capability patterns and delivery processes , a work breakdown structure ( WBS ) is created .

  6. 软件设计人员可以创造并把他们的过程作为一个过程网站发布,或者作为一个工作分解结构输出到IBMRationalPortfolioManager。

    Software designers can author and publish their process as a process Web site or export it to IBM Rational Portfolio Manager as a work breakdown structure .

  7. 交付过程和其他的元素一起提供了一个工作分解结构(WBS),它可以导出到IBMRationalPortfolioManager。

    A delivery process provides among other things a work breakdown structure ( WBS ) that can be exported to IBM Rational Portfolio Manager .

  8. 工作分解结构编号系统允许项目员工:A。估算WBS元素的成本。

    A WBS numbering system should allow project staff to : A.

  9. 工作分解结构(WBS)在施工项目管理计划阶段中的应用

    The application of work breakdown structure in management plan of building item

  10. 工作分解结构(WBS:WorkBreakdownstructure)是项目范围管理中的技术,它是确定项目范围的一种主要技术,也是进行成本、资源的估算的基础。

    WBS ( Work Breakdown Structure ) is a technique of project scope control , it is used to fix on the scope of project and to estimate the cost and resource of project .

  11. 工作分解结构(WorkBreakdownstructure简称WBS)是国际上通行的以赢得值原理为基础的工程项目管理手段,是对项目工作进行合理分解基础之上的工作计划平台。

    Based on the internationally popular Earned Value Concept , Work Breakdown Structure is the Engineering Project Management . The project is the work plan platform reasonable based on the decomposition of .

  12. RMC还支持不同的过程表示,比如工作分解结构或工作流表示。

    RMC also supports different presentations for processes , such as work breakdown structure or workflow presentations .

  13. 第4章应用WBS方法进行工作分解结构,细化工作内容,分解阶段性目标,并对项目的时间和成本进行了估算。

    Chapter IV discusses decomposing structure under WBS , refining working content , analyzing phase object and evaluating of cost .

  14. 首先在深入了解网络计划技术和CG项目制作流程的基础上,根据CG项目的工作分解结构,利用分级网络技术为项目建立系统的网络图;

    After the research of classifying net plan technic and produce flow and the Work Breakdown Structure of CG project , it constructs systemic net chart ;

  15. 然后,通过使用项目的工作分解结构、网络计划技术和责任分配矩阵等项目管理方法对X交通客运公司交通安全管理主要影响因素进行管理,取得了一定的绩效。

    Then , By using the project work breakdown structure and the network planning technology and the responsibility assignment matrix project management method to manage the main factors affecting the traffic safety management in the X bus company .

  16. 下图展现出了一个工作分解结构(WBS),它描绘了敏捷的现代化项目中的阶段与项目评估方法。

    The diagram below reflects a work breakdown structure ( WBS ) depicting phases and project approach for an agile modernization project .

  17. 一个RMC发布过程提供了一个完整的生存周期模型,该模型包括了被细化的在方法内容中的工作分解结构(WBS)。

    An RMC Delivery Process provides a complete lifecycle model that has been detailed by sequencing Method Content in work breakdown structures ( WBS ) .

  18. 介绍了工作分解结构(WBS)在航空发动机型号研制中的应用,描述了WBS的创新点,并分析了WBS的工程应用价值。

    The application of Work Breakdown Structure ( WBS ) in aero-engine model development was introduced The innovation and benefit on the application WBS in engineering were analyzed .

  19. 对航天型号研制工作分解结构(WBS)编制的意义和作用进行了研究和探索,提出了WBS主要的相关定义、编制要求和主要框架。

    The paper gives some researches and explorations on Spaceflight model Work Breakdown Structure ( WBS ), and brings forward the correlational definition , compilation demand , and the main framework of WBS .

  20. 简要介绍了工作分解结构(WBS)的概念及其内涵,分析了目前我国城市经营中存在的问题,并进一步探讨了WBS在城市经营中的应用。

    This paper introduces the concepts and connotations of WBS , analyzes on the problems existing in Chinese urban management at present , and probes into the application of WBS in the urban management .

  21. 借鉴工业工程(IE)中的WBS(工作分解结构)管理思想,提出了基于WBS的主生产计划管理设计方案;

    The file uses WBS ( Work Breakdown Structure ) which comes from Industry Engineering ( IE ) for reference , then it presents a project about MPS ( Master Production Schedule ) management which is based on WBS .

  22. 信息量化是构建信息管理系统的基础,对信息量化方法&工作分解结构(WBS)的基本原理进行了详细的阐述,并就WBS如何在项目的综合计划和综合控制中发挥作用进行了分析研究。

    A method of measuring the information in quantity , the work break structure ( WBS ), is introduced , and an analysis of how the WBS contributes to the comprehensive planning and comprehensive controlling is made .

  23. 采用WBS(工作分解结构表)、关键路径法(CPM)、施工进度甘特图等工具方法,对加油站信息化建设项目化管理进行了评估及衡量,提出了项目实施的注意事项。

    It uses the WBS ( work breakdown structure table ), critical path method ( CPM ), construction progress Gantt charts and other tools , on the petrol station information construction project management to assess and evaluate the project implementation considerations .

  24. 之后,根据互联网业务推广项目的特点和实施流程,列出了项目所需资源和项目的工作分解结构(WBS),并根据以上两方面资料编制了项目资源计划。

    According to the characteristics and implementation process of the Internet business promotion projects listed required for the project resources and project work breakdown structure ( WBS ) According to the above two aspects , the preparation of the project resource planning .

  25. 应用项目可行性研究方法对技术改造项目的启动阶段进行分析;应用工作分解结构(WBS)等技术对该项目规划与设计阶段进行分析;

    There is an analysis of technical project in 3 aspects in this paper-its life cycle , starting stage and planning period through using project life cycle theory , the feasibility studying method of project and Work Breakdown Structure ( WBS ) method respectively .

  26. 在挣得值方法分析的过程中用工作分解结构(WBS)原理画1教学楼工程的工作分解结构图和用梦龙项目管理系统画本工程的进度计划横道图。

    Earned Value Analysis in the process of is used the work breakdown structure ( WBS ) No.1 the teaching principles to paint a building project work breakdown structure chart and project management system with the Magnum picture of the project schedule bar chart .

  27. 在调研初期,运用项目范围管理理论确定调研的内容范围,并运用项目管理理论中工作分解结构(WBS)将研究工作进行结构分解,建立了调研工作分解结构。

    During the first period of study , the content and scope was determined by using the Project Scope Management Theory , and the research work was allocated by using the Work Breakdown Structure ( WBS ) theory , upon which WBS structure has been established accordingly .

  28. 它包括使用活动图进行说明的工作分解结构。

    It includes a Work Breakdown Structure illustrated with activity diagrams .

  29. 基于工作分解结构的跨企业项目多级网络计划

    Hierarchical network planning method based on WBS for cross-enterprise collaborative project

  30. 建设项目工作分解结构及其在工程中的应用

    Work Breakdown Structures of Construction Project and Its Applications in Engineering