引水隧洞

yǐn shuǐ suì dònɡ
  • Headrace tunnel;intake tunnel
引水隧洞引水隧洞
  1. 浅谈化学灌浆在某引水隧洞工程中的应用

    Application of chemical grouting in a intake tunnel works

  2. 雪龙滩水电站引水隧洞施工技术措施的探讨

    A Probe into the Construction Technology Measures of Intake Tunnel of Xue Longtan Hydroelectric Station

  3. BEAM地质超前预报系统在锦屏引水隧洞TBM施工中的应用

    The Application of the Beam Geological Advance Prediction System for the TBM Construction of the Jinping Diversion Tunnel

  4. HK砂浆在莲花水电站1号引水隧洞补强加固工程中的应用

    Application of HK mortar in reinforcing the water tunnel in Lotus hydropower station

  5. 浅谈锦屏电站引水隧洞TBM施工测量方法

    Discussion on the Measure Method of the TBM Construction for the Diversion Tunnel of Jinping Hydropower Station

  6. 基于VOF法的长距离无压引水隧洞充水过程模拟

    Numerical simulation on water-filling process of long-distance non-pressure water diversion tunnel based on VOF method

  7. 采用kε模型,结合能量传输方程建立了引水隧洞三维水温预测模型,并在利用原型观测资料验证模型的基础上,对拟建的锦屏二级引水隧洞的水温进行了预测。

    A 3D numerical temperature model for diversion tunnel is established by combining the k - ε model and the energy transport equation . The model is tested with the prototype observed data .

  8. 通过对不同掘进长度的引水隧洞TBM三维动态施工通风进行模拟,合理优化了施工通风方案。

    By simulating 3D dynamic construction ventilation in the long diversion tunnel TBM construction , the design of ventilation system is rationally optimized .

  9. 引水隧洞跨度大,现场量测、观察难度较大,尤其是TBM施工掘进速度快,支护跟进迅速。

    Diversion tunnels ' span are large , on-site measurements and observations are difficult , especially in the construction of TBM driving fast and supporting up quickly .

  10. 接着将风险的可拓识别模型和可拓评判模型应用于国际工程项目&津巴布韦的DD引水隧洞,应用结果证明了所建模型的可行性。

    Then the methods and the models are applied to the international project & DD tunnel in Zimbabwe , which testify the feasibility of the methods and models established above .

  11. 通过ETM卫星影像和野外考察分析了工程引水隧洞线路区断层的空间分布及活动特征。

    Through ETM and exploring in site , analyze the distribution and the activity of active faults , evluate faults influences on the stability of deeply buried long tunnel .

  12. 引水隧洞TBM施工是一个复杂的系统工程,受众多不确定性因素的影响和制约,尤其是在复杂地质条件下进行TBM施工,将给施工进度与结构安全带来更大风险。

    Diversion tunnel TBM construction is a complex system influenced by a lot of uncertain factors . Especially , TBM construction schedule and the safety of segment may be seriously impacted while geologic risks happening .

  13. 边坡最大组合坡高达420m,上游与倾倒蠕变岩体自然边坡连成一体,坡脚布置有9条大直径引水隧洞,其下与导流洞进口开挖区连成一片,形成轮廓复杂的高边坡。

    Nine big excavation water-intaking tunnels lie at its foot . It is interconnected with excavated slope of the diversion tunnel 's intake , forming a high slope with complex outline .

  14. 南水北调西线一期工程的引水隧洞长达73km,最大埋深1100m,因此软围岩大变形及岩爆等工程地质问题尤为突出。

    Seepage tunnel of the west line of water diversion project from south to north of China is 73 km long and its maximal depth of burial is 1 ? 100 m. Therefore , large deformation of weak rock and rock outburst should become notable .

  15. 光电测距仪在引水隧洞施工测量中的应用

    Application of Photoelectric Rangefinder to Construction Surveying of Water Delivery Tunnel

  16. 大规模引水隧洞群施工方案三维有限元分析

    3-D FEM analysis for excavation sequence of large scale power tunnels

  17. 丹巴水电站引水隧洞地下水工程效应分析

    Engineering analysis of the groundwater diversion tunnel of Danba Hydropower Station

  18. 软岩大跨度长引水隧洞施工支护与地质预报

    Construction Support and Geology Forecast of Weak Rock Large-span Long-diversion Tunnel

  19. 无压引水隧洞水力过渡过程计算及试验研究

    Numerical Computation and Experiment on Hydraulic Transient in Free flow Tunnel

  20. 岩石引水隧洞钢筋混凝土衬砌计算分析

    Computation and Analysis of Reinforced Concrete Lining of Tunnel in Rock

  21. 光面爆破技术在小断面引水隧洞中的应用实践

    Application of Smooth Surface Blasting Technique in Small Section Water Drawing Tunnel

  22. 某引水隧洞工程的质量检测与评价

    Quality supervising and evaluation in a passing water tunnel project

  23. 无压发电引水隧洞经济断面动态分析

    Motional , Analysis About Economic Section of Non-Pressure Power Water Diverting Tunnel

  24. 长距离无压引水隧洞水气两相流数值模拟

    Numerical simulation of water-air two-phase flow with free surface in long tunnel

  25. 钢纤维喷混凝土在引水隧洞永久支护中的应用

    Application of steel fibre shotcrete in permanent support of water diversion tunnel

  26. 高压引水隧洞的有限元计算

    The calculation of high pressure tunnel by means of finite element method

  27. 引水隧洞围岩位移的非等步长灰色模型预测

    Tunnel Rock Displacement Prediction Based on Unequal Step Grey Model

  28. 喷锚技术在富尔江引水隧洞中的应用

    Jet bolting qpplied in the diversion tunnel of fuer river

  29. 采用盾构法施工的引水隧洞勘察工作要点探讨

    The Discussion of Water Diversion Tunnel Survey Work Using Shield Method Construction

  30. 深埋大直径无压引水隧洞基于流变的风险分析

    Risk analysis of deep-buried free-flow large-diameter tunnel based on surrounding rock rheology