GPS技术在杭州湾跨海大桥首级控制网测量中的应用
The primary level GPS control surveying and crucial technology of the Hangzhou Bay Major Bridge
-
基于BP神经网络的GPS高程拟合及其在杭州湾跨海大桥中的应用
The GPS Height Fitting Based on BP Neural Network and Its Application in Hangzhou Gulf Bridge
-
GPS定位技术在跨海大桥外海沉桩施工中的应用
Application of GPS Technique to Piling Construction at Open Sea for Bridges over Sea
-
MSS自行式移动模架在杭州湾跨海大桥中的应用
Applications of Self-launching Movable Scaffolding System in Hangzhou Bay Bridge
-
本文介绍了杭州湾跨海大桥控制测量技术,讨论了在近海区利用全站仪对常规打桩船打桩的测量技术和在离海岸较远时利用GPS打桩系统打桩的方法。
In the paper , the surveying technique of the bridge is introduced , the application of total station instrument in piling of Hangzhou Bay Major Bridge is discussed .
-
杭州湾跨海大桥50m双幅混凝土箱梁运架方案探讨
A Scheme on the Erection of 50m Concrete Box Girder in Hangzhou Bay Bridge
-
带转向机构HCA在杭州湾跨海大桥斜拉索减振中的应用
Steering with HCA in the Hangzhou Bay Bridge stay cable vibration application
-
杭州湾跨海大桥滩涂区50m箱梁施工关键技术
Key Techniques for Construction of 50-m Span Box Girders of Hangzhou Bay Sea-Crossing Bridge in Tidal-Flat Area
-
杭州湾跨海大桥70m箱梁结构寿命随机分析
Stochastic Analysis of Durability of 70m Box Girder Structure of Hangzhou Bay Bridge
-
杭州湾跨海大桥70m跨连续梁的设计与施工
Design and Construction of 70 m Span Continuous Beam for Hang-Zhou Bay Sea-Crossing Bridge
-
港航EDI建设对南通港经济效益影响的分析研究杭州湾跨海大桥南通航孔斜拉桥施工监控
The Economic Analysis of EDI for Nan-Tong Harbour Shipping Operation ; Construction Control of South Navigable Cable-Stayed Bridge of Hangzhou Bay Sea-Crossing Bridge
-
GPS-RTK技术在杭州湾跨海大桥地震勘测中的应用
Application of GPS-RTK technology to earthquake reconnaissance and survey on the gulf of Hangzhou big bridge
-
杭州湾跨海大桥70m箱梁架设施工技术的探讨
Exploration on Erection Construction Technique of 70 m Box Girder at Hangzhou Bay Over Sea Bridge
-
杭州湾跨海大桥70m箱梁预制、运输及架设的关键技术
Key Technology of Precast , Transport and Erecting for 70m Box Girder in Hangzhou Bay Sea-Crossing Bridge
-
杭州湾跨海大桥70m箱梁梁体庞大,采用全液压自动伸缩整体拼装模板进行施工。
The whole hydraulic formwork is applied in 70 m prefabricated concrete box beam of Hangzhou Bay Bridge .
-
杭州湾跨海大桥70m预应力混凝土箱梁用海工耐久混凝土的试验研究
Test Study on Marine Structure Durable Concrete for 70m Span Prestressed Concrete Box Girders of Hangzhou Bay Sea-Crossing Bridge
-
锌加(ZINGA)防腐钢筋在杭州湾跨海大桥施工中的应用
Application of ZINGA on Reinforcing Steel Bars In Construction of Hangzhou Bay Sea-Crossing Bridge
-
东海大桥是中国第一座真正意义上的外海跨海大桥,海上60m非通航孔段桥梁采用6跨60m预应力混凝土连续梁的结构形式。
Donghai Bridge is the first really significant outland-sea crossing-sea bridge in China . 60-m non-navigation span bridge on sea uses the structural type of 6-span 60-m pre-stressed concrete continuous beam .
-
针对长大跨海大桥形变监测的困难性,提出了跨海大桥结构形变监测的动态基站自动监测技术,动态基站自动监测技术的核心是电子全站仪与GPS-RTK技术的有机集成。
The dynamic base-station monitoring technique of structural deformation of sea-crossing bridges is put forward to overcome the difficulty . The new way uses the integrated technique of ETS and GPS-RTK .
-
杭州湾跨海大桥南航道主墩(D13)基础采用直径2.8m、长120m的钻孔灌注桩。
The bored piles 2.8 m in diameter and 120 m in length were adopted in the foundation of D13 frusta under a bridge .
-
杭州湾跨海大桥海上引桥全部采用70m先简支后连续的预应力混凝土箱梁。
The offshore approach spans of Hangzhou Bay Sea-Crossing Bridge are all designed to use the 70-m span prestressed concrete box girders that are first simply supported and then made continuous during erection .
-
为满足杭州湾跨海大桥桩基工程打桩施工的需要,中港一航局一公司特购置了1台荷兰IHC公司首次生产的SC-250液压打桩锤。
The First Company of CHEC Tianjin Port Construction Corp purchased a SC-250 type hydraulic hammer manufactured by IHC of Holland in order to meet the demands of pile driving for the pile foundation engineering of Hangzhou Bay 's sea-crossing bridge .
-
杭州湾大桥是世界上最长的跨海大桥,在其工程建设中,使用了超大型运梁设备(2台800t轮胎式搬运机)对重达1400t的箱梁进行搬运。
The Hangzhou bay bridge is the longest bridge at sea in the world . In the construction of the bridge , the super sized girder carrier ( two 800t carrying implement with tyres ) are used to carry the 1400t box girder .
-
东海大桥是我国在海上建造的真正意义上的第一座跨海大桥,总长约31.5km,桥面宽度36.5m。
Donghai Bridge is literally the first over-the-sea bridge ever built offshore in China , the total length of which is 31.5 km and width is 36.5m . Fewer experiences are available in engineering and constructing such bridge in China by now .
-
跨海大桥大型预制墩柱的施工技术
Construction Techniques for Large Precast Pier Columns of Bridges over Sea
-
杭州湾跨海大桥桥位地形测绘中的潮位改正
Tide controlling of topographic survey for the Hangzhou Bay Major Bridge
-
跨海大桥结构安全自动监测技术研究
Research on Automatic Monitoring Techniques for Structures Safety of Bay Bridges
-
杭州湾跨海大桥钻孔灌注桩质量控制
Quality Control of Bored Pile Construction of Hangzhou Bay Cross-sea Bridge
-
特长跨海大桥安全监测方法的研究
Research on the Method of Safety Monitoring of Super-long Sea-crossing Bridges
-
论杭州湾跨海大桥项目的运作模式
Study on Operation Mode of Hangzhou Bay Cross - sea Bridge